Introduction:

This fundraiser seeks to purchase land and construct a concrete cinder block school building to accommodate preschool through 6th grade, offering a foundation for lifelong learning and community development.

Project Objective:

To build a durable, safe, and well-equipped school in Fendell, Liberia that provides education to children from preschool through 6th grade. The school will include classrooms, administrative offices, a library, labs, cafeteria, auditorium, restrooms, and play areas to foster a conducive learning environment.

Project Overview:

Purchase Land

  • Purchase adjacent lot to secure 1 acre for the school

Fence & Gate

  • Secure the property prior to construction with concrete cinder block fence & security gate

Auditorium

  • A multi-purpose structure for community events and extracurricular activities.

  • During the early phase, this will be partitioned and used as classrooms.

Classrooms

  • 2 preschool classrooms with age-appropriate furniture and teaching aids.

  • 4 kindergarten classrooms with age-appropriate furniture and teaching aids.

  • 6 classrooms for grades 1–6, each accommodating 30–40 students.

Restrooms

  • 2 restrooms for staff

  • 4 restrooms for students

Administrative Spaces

  • 2 administrative offices

  • 1 staff conference room

Library

  • A library equipped with grade appropriate books, computers, and adequate setting areas.

Computer Lab

  • A computer lab large enough for 30-40 students to have access.

Cafeteria

  • A kitchen area large enough to prepare meals for the students.

  • Seating area large enough for half of the student body to take lunch concurrently

Play Area

  • A secure outdoor play area with swings, slides, and open spaces for games.

  • A multi-purpose court for sports/games

Well and Pump

  • Drill a closed well with pump and connect to building

Septic System

  • A proper septic system for easy maintenance and prevent pollution

Solar System

  • Solar power and battery for power storage

Construction Details:

  • Building Material: Concrete cinder blocks for durability and climate resistance.

  • Foundation: Elevated to prevent water damage during rainy seasons.

  • Roofing: Corrugated metal roofing with insulation for heat reduction.

  • Sustainability Features: Rainwater harvesting system and solar panels for electricity.

Construction Plans:

  • Architecture plans and rending ... coming soon

Project Timeline in Phases:

  1. Land acquisition and preparation (Target: March 2024).

  2. Fence construction (Target: July 2025)

  3. Foundation construction (Target: November 2025).

  4. Cinder block structure construction of walls (Target: April 2026).

  5. Roofing and interior works (Target: July 2026).

  6. Installation of furniture, educational materials, and utilities (August 2026).

  7. Grand opening and school enrollment (Target: September 2026)